Showing posts with label Winter maintenance 15/16. Show all posts
Showing posts with label Winter maintenance 15/16. Show all posts

Wednesday, 4 May 2016

Completed job list - winter layover 2015/16

Purely for reference (mind like a sieve..), I completed the following this winter just gone:
  1. Lead halyard/topping lift back to cockpit - I came up with a far simpler solution than I originally envisaged [see here] but all done in the end - time will tell how successful it is...
  2. Electrics - full story here [clicky] in post form (start at the bottom with the first post, and work up to the latest)....  in summary, I installed
    • (new 12v battery in) battery box
    • wooden switch box with 6 switch/gang panel
    • isolator switch
    • all wiring for power to switch box/isolator
    • fitted and then wired USB charger and voltage meter
  3. Through hull deck plug for VHF aerial (Index Marine Cable Gland) installed [clicky] - those instructions may well have been written in Chinese for all the sense they made... 


  4. VHF aerial fitted [clicky] to back board
  5. Solar panel for battery [clicky] charging bought (just need to fit it!)
  6. Repaired/replaced the UV damaged velcro fasteners [clicky] on sail cover
  7. Replaced lock/hasp on port side locker lid
  8. Repaired starboard side forward knee on tender
  9. Replaced old rusty padlock hasp [clicky] on wash boards with new stainless steel one
  10. Replaced mooring pick up chain and swivel (the old one was original from when I first got Papillon so overdue for replacement) I'll probably use the old pick up chain as part of my anchor arrangements
  11. "New" main sail obtained and fitted
  12. Rubbed down and (multiple) coats of paint on wash boards [clicky] (also replacement reinforcing batten fitted) / cockpit locker lids (which were also re-glued)
  13. Rubbed down and coat of wood preservative on rubbing strakes / cockpit board
  14. Antifouled
  15. Serviced outboard
  16. Serviced Life Jackets
Clearly, as usual, some of them are 'givens', and will get added to next years list, but still a gratifying number of projects completed - who'd have thought it?? Electrics and a "new" main..!

Lessons learned last year ("Keep on top of the painting and varnishing as it will save time in the long run") paid dividends this year, but I'll add, "don't be a numpty and paint your exterior stuff, with interior paint" to the list of lessons..!

Next winter??  No idea... something'll pop up - it/they always do!

Monday, 4 April 2016

...and more work done.. job #4 "Lead halyard/topping lift back to cockpit" and an Oxalic wash

...  and I'll be glad to get afloat if only for a rest... 😏

Time is fast approaching for launching and, with this being the last weekend left, I decided to focus on the job(s) that need shore power so I picked up on the "Lead halyard/topping lift back to cockpit"; job #4...

Over time my idea's on how to do this have changed significantly from deck organisers and pulleys to what I actually ended up doing which is significantly simpler, but still took ages to actually measure and place before drilling...

I started with a piece of aluminium angle, drilled for the same bolts that hold the mast in the tabernacle (M10) - I drilled this at home, and also hacksawed and then filed the corners of the upper surface at the same time...


...put a couple of (M5) holes on the other surface for the blocks/eyes/shackles, or whatever else I use because I'm still not convinced this set up will be final..  eg. two single pulleys better, snap shackle not eye bolt, etc etc. Time will tell... 

For now though I had an eye bolt and double pulley in the spares box which I had originally bought to deck mount for this very job, but which worked just as well on the mast plate...


In terms of  placement I tried each of the potential options - either 'face up' or 'face down' on either the upper or lower fastening positions on the tabernacle, and lots and lots of testing with fair leads, pads, spare lines, and pulley positions before deciding the final position which in the end was
  • 'face up' on the upper attachment 
  • fairleads on blocks
  • fairleads positioned towards grab rail
..purely so that the halyard runs cleared the edge of the (sliding) hatch... like follows..


As mentioned, in order to help with the halyard run, the fair leads (one each for halyard and topping lift) are mounted on small blocks (of HDPE)...  the cam cleats (again one for each) are mounted on a block of wood (which is currently being treated with some wood preservative) and I am using the same holes as were used for a cleat (for the roller furling line) that was there, and has now been relocated outside of the grab rails (where it should have been in the first place). Again - I'm still not sure about the cleats so the block of wood will allow a decent test before I confirm - if I'm happy I'll drill the block to also bolt on the other side...


Red topping lift/blue halyard/green roller furling

..so mostly done - just cam cleat block to finish and bolt - holes are all drilled, I can do it any time..


Controlled pandemonium... 

I finished off with a wash down of cockpit and hull with Oxalic...  amazing stuff! Just a reminder this is a before shot - note the grime at water line...

and this is an after - gone...





...and it really was as simple as washing on with a sponge and leaving it for ten minutes... just as an example I missed a couple of bits underneath the stern - I'll get them before I go in, but if that doesn't show before and after I don't know what does!

Saturday, 2 April 2016

More work done...

...despite Katie [clicky] doing her worst, more work was completed...

A good session over the last weekend saw the completion of the fledgling electrical system - no pictures yet, as I want to tidy up first, but in detail:
    1. New M4 bolts were fitted to hold the switch box in place - at 70mm they just fit from inside the bottom of the switch box to just under the shelf it is sitting on
    2. Fitted the earthing block to the left side of the switch box - two M5's used (which is overkill but I was going to use them for connecting the negatives as well, so the size was chosen for the crimps I was going to use)
    3. Fitted the master power switch - in the end I positioned it just under the step to the cabin as it is out of the way, protected by the step, and easy to get to - used a 22mm flat drill bit to make the hole for the key shaft and then through bolted the base from behind - good access to the battery box and cables are nicely out of the way on the inside of the bulkhead holding the step..
    4. Drilled a hole, from underneath, through the shelf and into the switch box, with the same flat drill bit - this is the access for all power cables to the switch box
    5. Measured off the positive from battery to master switch, and added in a foot or so to allow for moving battery/access, cut and added a 16mm2 crimp terminal (with a 10mm hole suitable for fitting to the posts on the master switch) put it on the post on the "downstream" (ie. to the battery) side of the master switch and bolted home. Then added another crimp the same size for the other side of the master switch ("upstream" ie. to the switch box) and bolted that on, then fed the remainder of the cable up behind the bulkhead and into the switch box where I fitted a spade connector the right size for the positive on the switch panel. All crimps and spades were then wrapped with amalgamating tape for protection and rigidity...
    6. The negative was simpler - measured off the length from the battery, up behind bulkhead, into switch box, and to the earthing block, added 6"- 9" to give some slack to play with, and then cut and attached a 16mm2 crimp terminal, but this time with a 6mm opening. I attached that to the bottom of the block (using the same bolt securing the earthing block to switch box as mentioned above), added another crimp (same size) to the remaining length, and bolted that to the top of the earthing block (using the same bolt), and then put a spade connector on the other end to connect to the negative on the switch panel. Again all crimps and spades were wrapped with amalgamating tape
Then I tested it, and I'm delighted to say everything worked as it should* - when switches are turned to 'on' the integral light comes on! 👍

As I mentioned, a bit of tidy up work to do, but to all intents and purposes the fledgling 12v system is up and ready for appliances to be added...    I had some birthday money recently so first on the list is a combined voltage and USB charger, next will be the mast head light (which is already wired to the mast head, I just need to extend wiring from deck plug to switch panel). If I get time I'll then do the VHF, or it can wait....

* bit disappointed with the quick release clamps which don't fit the positive post on the battery - need to revisit, but I may need to order an alternative...

In between doing that lot I then finished the washboards - an extra coat on each between the showers, an extra coat on the batten, and I finished the day by bolting the whole lot together...

I've also finished the cockpit hatches - from this:



...to this - clamp and glue...



..to this...   four coats of exterior (don't ask!) silk white paint later..




Lastly, the outboard is back from servicing - just over £100 for a full service (including a plug change this year) and also the replacement/service of the inertia screw (to keep the outboard centred) which was slipping last year..  very reasonable to be honest.... any number of people will say I should do it myself, but I'm a mechanical numpty and I rely on the engine working...

Oh, and I also restocked the boats bar (Hobgoblin this time), and updated the essential supplies...

...suffice to say the old ones they replaced had not been eaten in two years, but as the tins were going rusty I thought it advisable!

So what's to do before she goes in?

One, leading the halyards/topping lift to the cockpit - I've just taken delivery of a couple of bullseye fair leads, I also need to do some minor engineering work on the piece of aluminium angle that will bolt to the mast (drilling the holes, cutting an angle on the edges to minimise possibility of self inflicted wounds, and file smooth all edges)

Two, a damn good wash down - just had some Oxalic acid delivered, looking to see what that will make of the stained gel coat in the cockpit....

Launch is getting close!!!

Thursday, 24 March 2016

Coming along nicely...

Just over two weeks to launch, and with another Atlantic low tracking in (it must be a Bank Holiday weekend), I decided to take a day off on what looked to be the last good weather day for a while in order to get some work done on Sparrow..

First order of the day was anti-foul..  for good reason the club likes members to anti-foul at least a week before launch as it means the paint has a chance to harden off a little, and therefore not leave deposits all over the strops used on the 8 ton lift, which then get transferred to top sides of the next boat, and the next, and etc..  With this weekend looking to be a wipe out, and the low staying with us until well into next week, it was a bit of a "no brainer"..

So obligatory "before" shot..  all taped up and the first tray loaded...


..and that ground is as hard as it looks...


...and I love this bit... "after"...  my absolute favourite bit is taking off the masking tape - watching that straight line appear...  small pleasures!


.....I'm convinced the chap behind me is using the same brand....

...a little over 2 hours with a break in the middle for a coffee - it's a hideous job, especially the bit between the keels..  even with gloves, all over covering and glasses, I was still liberally smeared and spotted... when I got home that evening I even had a couple of paint spots on my front teeth..! 

Went with a new plan this year and used the entire tin - just kept painting it on until I didn't have anything left - previous years I've given it two coats and an extra on the waterline and come away with a half litre of paint for "just in case" which I then never use, so two thick coats all over, and then extra thick coats on bilge keels, rudder and water line...  time will tell (as usual) but I liked this stuff as it was a little less viscous than the usual stuff so much easier to roll on..

After that it was time for a beer from the boats bar with a cigar and a time for contemplating, before cracking on with some fettling jobs.....

  • Mixed up some plastic padding and filled those holes on the cockpit hatch and weather board from the previous padlock hasp, and 
  • while I had some spare I also filled a couple of old/small dings on the sides..  (as is the way of these things I then spotted a couple of others I'll do next time)
  • Glued and test bolted a batten to the inside of the top washboard cover - clamped it while it dried and once it was firm removed the clamps and slapped a coat of paint on the batten...
  • Put the final coat on the bottom washboard
  • Put the final coat of wood treatment on the tiller, outboard bracket and companion way sides
Jobs for next time:
  1. Rub down the plastic padding and paint both the hatch edge and the top weather board
  2. When the top weather board paint is dry, bolt through the batten to complete the top washboard
  3. Fit the earthing block inside the switch box
  4. Rub down the repairs to the dings on the topsides
  5. Fit the master switch
  6. Fit the crimp terminals to the negative and positive battery feed cables (measure the positive first as it is a partial length ie. battery <=> master switch <=> switch box/panel)
  7. Connect power to switch box and test
  8. Put the last coats on the cockpit hatches (they're at home so I can do them any time)
...after that I then want to do the bits and pieces to run the topping lift and halyard back to the cockpit.. then fit the cable gland for the VHF, and finally, give her a wash down with some Oxalic that I've just ordered....   no sweat!

Happy Easter, folks...

Saturday, 19 March 2016

More ticks than a mangy dog - how did I do...

So how did I do??

1/. Fledgling 12v electrical system... job #5

I put up a separate post [clicky] but all initial goals were met..  the battery box and the switch box were installed..

2/. Job #4 Lead halyard/topping lift back to cockpit:

Not started..

3/. Job #18 Padlock hasp on wash boards - old one was rusting solid - completed...

From this...


To this...

Just need to fill those old holes and then re-paint....


4/.  Job #21 Rub down and coat of paint on the wash boards - almost done - two coats applied, I'll put another coat on before I'm finished - in addition the top/upper board has a batten reinforcement that proved to be hopelessly rotted - I whipped that off and will replace with fresh...



5/. Job #22 Rub down and coat of wood preservative on rubbing strakes / cockpit board - done - ended up putting two coats on, and also rubbed down and gave the tiller two coats, and also a coat on the outboard board, and the sides of the companion way (the last two will get an extra coat this weekend)...

I said if I got that lot done I'd deserve a pint I'd definitely be having.... and I did, "Otter Amber" [clicky], and absolutely delicious... oh, and in addition to the above I also serviced the life jackets...  we're getting there.... 

Friday, 11 March 2016

More ticks than a mangy dog.. redux...

Remember saying that last winter as we got close to launch, but despite getting a lot of stuff prepared, I've not quite hit the heady heights of last Spring...  It's been a cold wet windy winter, and I've been busy with work and family stuff so I've not done quite as much as I would have hoped to date, but having said that most of the stuff on the list is "non-urgent" - I've done the critical stuff in previous years...

So this is what I'm hoping to get done this weekend.... the forecast is for warmer sunny weather and I also have Monday off so I can crack the back of it...

1/. Fledgling 12v electrical system... job #5

All the stuff I ordered has arrived with the exception of the stainless steel earthing bar (parts availability crisis apparently - should be with me soon though)..

I also devoted some thought to a cupboard or box to keep it all in and rather than make one (which I could do, but it wouldn't be as nice) I ordered one of these from eBay - the quality is superb. I'll give it a coat of preservative, and then cut the holes for the switch panel/master switch/anything else in the lid (which is hinged, and has a catch for access to wiring)


My plan is to position it here - red or blue depending on whether I put it in upright or on its side - the dark wood you can see is the lip to a shelf, I'll take the lip off so that the box sites directly on the shelf, I'll then either put a bolt through the shelf, or through the edge of the cockpit hatch sides to hold it in place...  cables will be fed from the battery up the inside of the bulkhead and through two drilled holes in the shelf/box into the box itself....


2/. Job #4 Lead halyard/topping lift back to cockpit:

I was having second thoughts because the position of my mushroom domes on the cabin top obstructed the run of the lines from the bottom of the mast, and I had started thinking along the lines of a shackle and block on the tabernacle, with a bullseye fairlead on the cabin top to feed the line to the jammers/cleats/cam cleats over the mushroom domes.

I'm confirmed in my idea and have come up with a far simpler solution than I originally envisaged - I have bought some 3mm aluminium angle (2" by 2" and 10cm long) - this I'll drill so it fits over the  bolt that goes through the tabernacle to hold the mast. In effect this angle will act as a "washer" on the port side of the lower nut and bolt...  the upper surface of the angle I will drill twice to take a shackle which will then hold a block to feed the main halyard (possibly) and topping lift (definitely) back to the cockpit - I can then either use the cam cleats I bough previously or keep it simple with a couple of cleats..  the height of the block will keep the line clear of the mushroom domes and cockpit hatch, the bullseye's will ensure a clean run to the cleat....

I'm thinking of not worrying about leading the main halyard back, as I have to go to the mast to reef anyway..  topping lift definitely though.. while I'm about it I will also install an additional cleat for the roller furling line for the genoa on the outside of the grab rails on the cabin roof.

3/. Job #18 Padlock hasp on wash boards - current one  is now rusting solid - I have a replacement so just whip the old one off and replace with new stainless steel one - hopefully after I've done the next one...


4/.  Job #21 Rub down and coat of paint on the wash boards - first job of the day so they can dry while I get on with other stuff

5/. Job #22 Rub down and coat of wood preservative on rubbing strakes / cockpit board - this was my success story of last winter - very pleased with the results, no blistering, no wearing, no lifting - still looks as good as new so just one coat required...

If I get that lot done I'll deserve the pint(s) I'll definitely also be having....! 

Saturday, 20 February 2016

Job #13 - sail cover velcro replace - done..

The plan worked a treat... all done and dusted inside of 45 minutes... one down and a whole load more to go... 


Dropped the idea of a rivet both sides as the pop rivet didn't have enough depth...


Drill through with a 4mm drill bit (I used one for metal not wood as the wood ones were too sharp and tore up the webbing), push the rivet through, slip the washer on on the reverse, squeeze the two sides together with a pair of pliers, and then crimp the rivet..  I found that if I didn't do the squeezing bit first, the rivet didn't sheer cleanly..


That'll do..  not the most exciting of posts, but hey, we get our jollies where we can...  

Wednesday, 10 February 2016

Fledgling 12v electrical system... job #5

Time to start thinking about job #5, installing some electrics.. been two years now and that's long enough - I feel the need to be able to press switches and see lights come on.... 😀

So basic requirements at this stage is nothing more than:
  1. battery
  2. isolator switch
  3. bus bar
  4. switch panel
 ...working towards the following....

Click to "embiggen" - this diagram shamelessly ripped off from the Sailing Around blog [clicky] (worth visiting by the way)
 1. Battery

So my good mate Giblets gifted me a battery when we exchanged the spondoolics for the new outboard the summer before last, and up until now it has been sat in my garage.

I have put it on an occasional charge, and it seems to hold that charge so I think it's good to go, and if push comes to shove I can always replace it...

Some basics - the battery dimensions are 13cm by 19cm by 24cm (W/L/H), and it is 40 amph's - so not huge, but suitable to my purposes at this stage..  most importantly it's a sealed unit so I can turn it over, even upside down, with impunity while getting it into position

It will be in a battery box, which will then be strapped to a sheet of epoxied marine ply, which will be either:
  • bolted between the sides of the quarter berths, just behind the cockpit drains and under the cockpit sole....  or..
  • bolted to the lip of the opening for the same space
...this shows the spot, and the opening... option one is widthways roughly where that white rag is , the lip of the opening for option 2 (lengthways) is in the foreground..

 The opening I've taken the picture through is 22cm high so everything will fit through in one dimension or the other...  I also have limited access to that space from above via the quarter berths...

2. Isolator switch

Any number of these are available on eBay and the like, I am an electrical novice, but I had one of these on Pap and if it was good enough there, it's good enough for Sparrow..  this is the master switch to the whole system, if this is off, there's no power to any of the devices in the boat...

The studs underneath are M10 - one is connected via cable to the positive on the battery, the other connects via cable to the switch panel..

For cables I've bought a set of car jump leads - yes, I know tinned cable would be better, but they are 4 or more times the cost..  From what I can tell these are 16mm2 (they are 100Amp capacity so plenty of oomph) , so 8mm outside diameter and 2mtrs long. The planned cable run will be short, no more than a metre, maybe a metre and a half.

For connectivity at the battery I already have quick release cable clamps (you can get bolt on one's, but I had quick release on Pap so I'm falling back on duplicating what I know and am comfortable with.
The other end of the positive cable will have a copper tube terminal (16mm2 with 10mm opening) to attach to the stud on the isolator switch. I will take a length off - length TBD once I see where the switch physically is - to attach to the other side of the switch, and connect to the next element in the puzzle...

3. Bus bar

So.... thus far we have battery, in box, bolted to boat (via battery box/ply board), with 16mm2 copper cables attached to the battery using quick release clamps - one positive/one negative.

On the positive cable we have the isolator switch wired in, but on the negative side currently just the bare cable length. This (negative) cable I will connect to a 12v bus bar so I have a common negative for anything I want to attach to the switch panel...  you could use a power distribution post (like a big bolt) but a bus bar allows you to work on each device without having to take everything off the post to get at the cable you want (probably the one at the bottom!)

You can buy a pukka bus bar, but they are 6 times the cost of the following which was recommended to me by the guys on the  Practical Boat Owner web forum - this is a stainless steel 8 Way Earth Terminal Block...

...and on to the next step in the puzzle..

4. Switch panel

So.... thus far we have battery, in box, bolted to boat (via battery box/ply board), with 16mm2 copper cables attached to the battery using quick release clamps - one positive/one negative. Positive cable (red) has an isolator switch wired in, the negative (black) runs direct from the battery to the bus bar/earthing block. Now I need the thing to allow me to turn individual devices off and on - the switch panel....

These switch panels are available in a bewildering number of styles & prices, and are a bit of a God-send as they come pre-wired, and with fuses...  I've chosen a 6 switch (6 gang) panel as my requirements will always be pretty simple, and I plan to combine some devices on a single switch anyway (nav lights for example) - I've also chose one where the light comes on when the switch is turned on (at least you know there's power there when you see the light )



The wiring basics are as follows:

..and I'll:
  • attach the positive cable (from the battery via the isolator switch) to the switch panel
  • the switch panel is a device in it's own right (as the switches light up when they are on), so it also needs a negative - the board comes with one wired in, and that needs to be connected to the bus bar - at this point if everything is connected up, and the isolator switch is off (ie. power is on), then the lights in the switches will work when you click them...  hopefully....
...seemples....   he also said hopefully.....

All the subsequent things I'm going to connect to the switches on the panel (VHF/nav lights etc.) will then have their negatives screwed into the bus bar and their positives to the required switch on the panel.. depending on the panel I get, the fuses will be a variety, so I will choose switch based on fuse...  but that's next stage....

Just in case anyone is interested - here's the costs so far...
  1. battery - free
  2. battery box - £15.99
  3. jump leads for battery cables - £4.90
  4. isolator switch - £4.99
  5. bus bar - stainless steel 8 Way Earth Terminal Block - £3.18
  6. switch panel - £18.95

Wednesday, 20 January 2016

A new year, and the first tentative steps.. Job #13

...are being taken..

The component bits for job #13 ("Repair/replace velcro fasteners on sail cover") are on their way - I've gone with the replace option and will change the current velcro tapes (which have softened and degraded due to UV damage and use) for clip buckles (similar to those you get on backpacks)

Bargain...


..couple of metres of replacement webbing


..and the UV resistant thread to cobble the lot together..


..too thick for a domestic sewing machine so I'll be doing this by hand.. the good news is I can do it while sat in front of the TV in the warm!